Engineers from Cross River State Electrification Agency have commenced a comprehensive assessment of power infrastructure in Bakassi Local Government Area of the state, which has been without electricity for more than a decade.
The assessment team, led by the AIG Chief Enene Okon (retd.), inspected power facilities in the 10 political wards of the local government to determine the condition of existing infrastructure and identify the interventions required to reconnect communities to the national grid.
During the inspection, the engineers assessed transformers and other power facilities in various communities, identifying some units requiring repairs and others needing complete replacement.
The exercise, according to the team, is expected to provide the technical baseline for the state government’s planned intervention in the area.
Speaking during the inspection, Okon commended the state governor, Senator Bassey Otu, for what he described as the administration’s commitment to the development of Bakassi.
He cited the proposed power restoration, sustained efforts to maintain peace and security, and the planned Bakassi Deep Seaport project as some of the initiatives expected to boost development in the area.
Okon described the assessment as a significant step towards addressing the prolonged electricity crisis in Bakassi, despite what he said was skepticism and opposition from some quarters in the communities.
He also urged residents to maintain their support for the All Progressives Congress (APC), saying continued political alignment will help sustain government attention and development in the area.
READ ALSO: FG has not neglected Bakassi LG, says Senate
The team received a warm reception in several communities, with youths joining the delegation as it moved from one ward to another.
Residents expressed optimism that the assessment would be followed by concrete action to restore electricity in the local government area.
Meanwhile, residents of Ekong/Ekeya community in Ward 12, Calabar South Local Government Area, have appealed to the government to extend a similar intervention to the community, which has been without electricity for about 10 months.
A community representative, Ndabu Okposin David, urged the government to use the current electioneering period to provide the community with a new transformer.
Okposin said the community had contributed significantly to electoral outcomes in the state and deserved government attention.
He said: “We don’t have potable water in this community. Our roads have been washed away by erosion, turning the community into an erosion site. Even with all these challenges, we can still manage, but electricity is very important. It is difficult to live our day-to-day lives without electricity.”
The Nigerian Tribune gathered that Ekong/Ekeya is located a few kilometres from the University of Cross River State (UNICROSS) and has a large population of students and residents from different parts of the state and beyond.
The prolonged outage, according to residents, has continued to affect businesses, domestic activities and the general quality of life in the community.
WATCH TOP VIDEOS FROM NIGERIAN TRIBUNE TV
- Relationship Hangout: Public vs Private Proposals – Which Truly Wins in Love?
- “No” Is a Complete Sentence: Why You Should Stop Feeling Guilty
- Relationship Hangout: Friendship Talk 2025 – How to Be a Good Friend & Big Questions on Friendship
- Police Overpower Armed Robbers in Ibadan After Fierce Struggle


